Journal of Guangxi Normal University(Natural Science Edition) ›› 2019, Vol. 37 ›› Issue (3): 111-119.doi: 10.16088/j.issn.1001-6600.2019.03.013
Previous Articles Next Articles
LI Lujie1,DONG Na1*,XIONG Feng1,LUO Linglong2,LI Hongyang3
CLC Number:
[1] WANG X Y, Fan S Y.Study on management control auditing on construction project[J].Advanced Materials Research, 2011, 217-218: 262-267. DOI: 10.4028/www.scientific.net/AMR.217-218.262. [2] 鞠占玲.平衡计分卡的应用及其改进[J].企业管理,2014,12:110-112.DOI:10.3969/j.issn.1003-2320.2014.12.039. [3] 李林,朱沙沙,王雨婧.低碳经济下公共工程项目绩效评价内涵探析[J].湖南大学学报(社会科学版),2013,27(1):69-72.DOI:10.3969/j.issn.1008-1763.2013.01.011. [4] 谭涛,熊志坚.工程项目绩效评价指标体系比较研究[J].科技管理研究,2014,23:81-90.DOI:10.3969/j.issn. 1000-7695.2014.23.017. [5] COSTA D B, FORMOSO C T,KAGIOGLOU M, et al.Benchmarking initiatives in the construction industry:lessons learned and improvement opportunities[J].Journal of Management in Engineering, 2006,22(4): 158-167. DOI:10.1061/(asce)0742-597x(2006)22:4(158). [6] BASSIONI H A,PRICE A D F,HASSAN T M.Performance measurement in construction[J].Journal of Management in Engineering,2004,2(2):42-50.DOI:10.1061/(ASCE)0742-597X(2004)20:2(42). [7] CHOU J S,LEATEMIA G T.Critical process and factors for ex-post evaluation of public-private partnership infrastructure projects in Indonesia[J].Journal of Management in Engineering, 2016, 32(5):05016011.DOI:10.1061/ (asce)me.1943-5479.0000436. [8] 王安民,马雪.基于BSC-FNN的项目管理办公室绩效评价研究[J].建筑经济,2013,5:34-37.DOI:10.14181/j.cnki.1002-851x.2013.05.008. [9] 肖凯.基于平衡计分卡的财务与非财务指标的融合[J].统计与决策,2011,19:180-183.DOI:10.13546/j.cnki.tjyjc.2011.19.054. [10]张思荣,裘樨盈,张敏,等.基于可拓学与BSC的工程项目绩效评价研究[J].工业工程与管理,2012,17(1): 64-69.DOI:10.3969/j.issn.1007-5429.2012.01.012. [11]李平.EVA在建筑企业业绩考核中的运用[J].财务与会计,2012,7:23-25.DOI:10.3969/j.issn.1003-286X.2012.07.014. [12]CHOI M S.A study on weights of the factors to evaluate technological capabilities of a bidder in a construction project[J].Journal of the Architectural Institute of Korea Structure & Construction, 2007,23:195-202 [13]李治国,滕惠平.平衡记分卡在EPC型企业战略管理中的应用[J].建筑经济,2012,5:73-75.DOI:10.14181/j.cnki.1002-851x.2012.05.021 [14]THIPPARAT T.A fuzzy multiple criteria decision framework for engineering performance evaluation[J]. International Journal of Technology Intelligence and Planning,2009,5:322-325.DOI:10.1504/ijtip.2009.026752 [15 ]谢忠秋.Cov-AHP:层次分析法的一种改进[J].数量经济技术经济研究,2015,8:137-148.DOI:10.13653/j.cnki.jqte.2015.08.009 |
No related articles found! |
|