Journal of Guangxi Normal University(Natural Science Edition) ›› 2019, Vol. 37 ›› Issue (3): 111-119.doi: 10.16088/j.issn.1001-6600.2019.03.013

Previous Articles     Next Articles

Research on Performance Evaluation of Construction Project Management Based on Cov-AHP and Connection Degree

LI Lujie1,DONG Na1*,XIONG Feng1,LUO Linglong2,LI Hongyang3   

  1. 1.College of Architecture and Environment, Sichuan University, Chengdu Sichuan 610065, China;
    2. Sichuan Huaxi Group Co. Ltd., Chengdu Sichuan 610065, China;
    3. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou Guangdong 510641, China
  • Online:2019-07-12 Published:2019-07-12

Abstract: With increasing competition in the construction market, the level of project management becomes the key factor to the sustainable development of the construction enterprises, and effective evaluation of project management performance is essential for its continuous improvement. In this paper, the status quo of evaluating project management performance in China is comprehensively studied. The performance evaluation of construction project management system is redesigned based on the methods of balanced score card (BSC) and key performance indicator (KPI), and the evaluation index system established according to the five dimensions of economy, technology, materials, personnel and management. The improved Cov-AHP is used to determine the weight of each index, and the project is evaluated comprehensively by determining the connection degree. Finally, the feasibility of the evaluation model is verified through practical cases.

Key words: project managemen, performance evaluation, BSC-KPI, Cov-AHP, connection degree

CLC Number: 

  • TU712
[1] WANG X Y, Fan S Y.Study on management control auditing on construction project[J].Advanced Materials Research, 2011, 217-218: 262-267. DOI: 10.4028/www.scientific.net/AMR.217-218.262.
[2] 鞠占玲.平衡计分卡的应用及其改进[J].企业管理,2014,12:110-112.DOI:10.3969/j.issn.1003-2320.2014.12.039.
[3] 李林,朱沙沙,王雨婧.低碳经济下公共工程项目绩效评价内涵探析[J].湖南大学学报(社会科学版),2013,27(1):69-72.DOI:10.3969/j.issn.1008-1763.2013.01.011.
[4] 谭涛,熊志坚.工程项目绩效评价指标体系比较研究[J].科技管理研究,2014,23:81-90.DOI:10.3969/j.issn. 1000-7695.2014.23.017.
[5] COSTA D B, FORMOSO C T,KAGIOGLOU M, et al.Benchmarking initiatives in the construction industry:lessons learned and improvement opportunities[J].Journal of Management in Engineering, 2006,22(4): 158-167. DOI:10.1061/(asce)0742-597x(2006)22:4(158).
[6] BASSIONI H A,PRICE A D F,HASSAN T M.Performance measurement in construction[J].Journal of Management in Engineering,2004,2(2):42-50.DOI:10.1061/(ASCE)0742-597X(2004)20:2(42).
[7] CHOU J S,LEATEMIA G T.Critical process and factors for ex-post evaluation of public-private partnership infrastructure projects in Indonesia[J].Journal of Management in Engineering, 2016, 32(5):05016011.DOI:10.1061/ (asce)me.1943-5479.0000436.
[8] 王安民,马雪.基于BSC-FNN的项目管理办公室绩效评价研究[J].建筑经济,2013,5:34-37.DOI:10.14181/j.cnki.1002-851x.2013.05.008.
[9] 肖凯.基于平衡计分卡的财务与非财务指标的融合[J].统计与决策,2011,19:180-183.DOI:10.13546/j.cnki.tjyjc.2011.19.054.
[10]张思荣,裘樨盈,张敏,等.基于可拓学与BSC的工程项目绩效评价研究[J].工业工程与管理,2012,17(1): 64-69.DOI:10.3969/j.issn.1007-5429.2012.01.012.
[11]李平.EVA在建筑企业业绩考核中的运用[J].财务与会计,2012,7:23-25.DOI:10.3969/j.issn.1003-286X.2012.07.014.
[12]CHOI M S.A study on weights of the factors to evaluate technological capabilities of a bidder in a construction project[J].Journal of the Architectural Institute of Korea Structure & Construction, 2007,23:195-202
[13]李治国,滕惠平.平衡记分卡在EPC型企业战略管理中的应用[J].建筑经济,2012,5:73-75.DOI:10.14181/j.cnki.1002-851x.2012.05.021
[14]THIPPARAT T.A fuzzy multiple criteria decision framework for engineering performance evaluation[J]. International Journal of Technology Intelligence and Planning,2009,5:322-325.DOI:10.1504/ijtip.2009.026752
[15 ]谢忠秋.Cov-AHP:层次分析法的一种改进[J].数量经济技术经济研究,2015,8:137-148.DOI:10.13653/j.cnki.jqte.2015.08.009
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] MENG Chunmei, LU Shiyin, LIANG Yonghong, MO Xiaomin, LI Weidong, HUANG Yuanjie, CHENG Xiaojing, SU Zhiheng, ZHENG Hua. Electron Microscopy Study on the Apoptosis and Autophagy of the Hepatic Stellate Cells Induced by Total Alkaloids[J]. Journal of Guangxi Normal University(Natural Science Edition), 2018, 36(3): 76 -79 .
[2] LI Yuhui, CHEN Zening, HUANG Zhonghao, ZHOU Qihai. Activity Time Budget of Assamese macaque (Macaca assamensis) during Rainy Season in Nonggang Nature Reserve, Guangxi, China[J]. Journal of Guangxi Normal University(Natural Science Edition), 2018, 36(3): 80 -86 .
[3] QIN Yingying, QI Guangchao, LIANG Shichu. Effects of Eichhornia crassipes Aqueous Extracts on Seed Germination of Ottelia acuminata var. jingxiensis[J]. Journal of Guangxi Normal University(Natural Science Edition), 2018, 36(3): 87 -92 .
[4] WEI Hongjin, ZHOU Xile, JIN Dongmei, YAN Yuehong. Additions to the Pteridophyte Flora of Hunan, China[J]. Journal of Guangxi Normal University(Natural Science Edition), 2018, 36(3): 101 -106 .
[5] BAO Jinping, ZHENG Lianbin, YU Keli, SONG Xue, TIAN Jinyuan, DONG Wenjing. Skinfold Thickness Characteristics of Yi Adults in Daliangshan,China[J]. Journal of Guangxi Normal University(Natural Science Edition), 2018, 36(3): 107 -112 .