|
广西师范大学学报(自然科学版) ›› 2016, Vol. 34 ›› Issue (2): 81-89.doi: 10.16088/j.issn.1001-6600.2016.02.012
周秀丹, 胡志华, 魏晨
ZHOU Xiudan, HU Zhihua, WEI Chen
摘要: 本文针对自动化集装箱码头成组直接中转情况下岸桥的调度问题,研究了中转完工时间、岸桥等待时间、集装箱组数之间的关系。首先,以最小化中转完工时间建立了优化模型;接着,在此基础上以最小化中转完工时间和岸桥的等待时间为目标建立了多目标模型。通过多组算例研究,获得在集装箱组数不同的情况下中转完工时间及集装箱组开始装卸时间,并分析了集装箱组数的设置对中转完工时间、岸桥等待时间带来的影响。拓展了岸桥调度的研究,为集装箱码头运营提供了岸桥调度的参考。
中图分类号:
[1] 匡海波, 牛文元. 集装箱港口多期投资优化决策模型研究[J]. 管理科学学报, 2012, 15(5):76-82. [2] 董岗, 朱道立. 港口集疏运通道投资与多车型拥挤收费均衡[J]. 管理科学学报, 2013, 16(5):83-94. [3] WU Yue, LUO Jiabin, ZHANG Dali, et al. An integrated programming model for storage management and vehicle scheduling at container terminals[J]. Research in Transportation Economics, 2013,42(1):13-27. DOI:10.1016/j.retrec.2012.11.010. [4] FU Yimin, DIABAT A, TSAI I T. A multi-vessel quay crane assignment and scheduling problem:Formulation and heuristic solution approach[J]. Expert Systems with Applications, 2014, 41(15):6959-6965. DOI:10.1016/j.eswa.2014.05.002. [5] TIERNEY K, PACINO D, JENSEN R M. On the complexity of container stowage planning problems[J]. Discrete Applied Mathematics, 2014, 169:225-230. DOI:10.1016/j.dam.2014.01.005. [6] CARLO H J, VIS I F A, ROODBERGEN K J. Storage yard operations in container terminals:Literature overview, trends, and research directions[J]. European Journal of Operational Research, 2014, 235(2):412-430. DOI:10.1016/j.ejor.2013.10.054. [7] 毛钧,李娜,靳志宏.基于混堆模式的集装箱码头堆场空间资源配置优化[J]. 大连海事大学学报, 2014,40(1):117-122. DOI:10.16411/j.cnki.issn1006-7736.2014.01.017. [8] 魏航.集装箱码头堆场取箱时间窗优化研究[J].管理科学学报,2011,14(9):21-36. [9] 孙凯.关于集装箱码头前沿操作工艺应对船舶大型化的研究[J]. 中国远洋航务, 2015(1):60-62. [10] 林浩,唐勤华.新型集装箱自动化码头装卸工艺方案探讨[J]. 水运工程, 2011(1):158-163. DOI:10.16233/j.cnki.issn1002-4972.2011.01.004. [11] 郑见粹,李海波,谢文宁,等. 自动化集装箱码头装卸工艺系统比较研究[J].水运科学研究, 2011(2):26-33. [12] 邢曦文, 毛钧, 张睿,等. 基于混合流水作业组织的集装箱码头装卸作业集成调度优化[J]. 中国管理科学, 2014, 22(10):97-105. [13] 范志强, 乐美龙. 最小化最大完工时间与等待时间的岸桥作业调度双目标优化及其遗传算法[J]. 系统管理学报, 2013, 22(1):120-127. [14] ZHANG Haipeng, KIM K H. Maximizing the number of dual-cycle operations of quay cranes in container terminals[J]. Computers & Industrial Engineering, 2009, 56(3):979-992. DOI:10.1016/j.cie.2008.09.008. [15] DIABAT A, THEODOROU E. An integrated quay crane assignment and scheduling problem[J]. Computers & Industrial Engineering, 2014, 73:115-123. DOI:10.1016/j.cie.2013.12.012. [16] FU Yimin, DIABAT A. A lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem[J]. Applied Mathematical Modelling, 2015, 39(3/4):1194-1201. DOI:10.1016/j.apm.2014.07.006. [17] NGUYEN S, ZHANG Mengjie, JOHNSTON M, et al. Hybrid evolutionary computation methods for quay crane scheduling problems[J]. Computers & Operations Research, 2013, 40(8):2083-2093. DOI:10.1016/j.cor.2013.03.007. [18] EXPÓSITO-IZQUIERDO C, GONZÁLEZ-VELARDE J L, MELIÁN-BATISTA B, et al. Hybrid estimation of distribution algorithm for the quay crane scheduling problem[J]. Applied Soft Computing, 2013, 13(10):4063-4076. DOI:10.1016/j.asoc.2013.05.006. [19] KAVESHGAR N, HUYNH N, RAHIMIAN S K. An efficient genetic algorithm for solving the quay crane scheduling problem[J]. Expert Systems with Applications, 2012, 39(18):13108-13117. DOI:10.1016/j.eswa.2012.05.091. [20] HOMAYOUNI S M, TANG S H, MOTLAGH O, A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals[J]. Journal of Computational and Applied Mathematics, 2014, 270:545-556. DOI:10.1016/j.cam.2013.11.021. [21] CHEN Jianghang, LEE D H, GOH M. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem[J]. European Journal of Operational Research, 2014, 232(1):198-208. DOI:10.1016/j.ejor.2013.06.051. |
No related articles found! |
|
版权所有 © 广西师范大学学报(自然科学版)编辑部 地址:广西桂林市三里店育才路15号 邮编:541004 电话:0773-5857325 E-mail: gxsdzkb@mailbox.gxnu.edu.cn 本系统由北京玛格泰克科技发展有限公司设计开发 |